We define the safety function, critical characteristics, and dedication methods for acceptance criteria for each component. During the technical evaluation, we determine the component's safety function, performance requirements, and any additional environmental or seismic testing needed. We also identify whether the replacement item is like-for-like, equivalent, or new.
A detailed CGID plan is developed to verify the component's critical characteristics and identify the testing tolerances required to pass or fail, ensuring that each component meets the safety requirements before entering service.
Key elements include:
Identifying critical characteristics; Selecting the appropriate dedication method; Defining testing tolerances and sampling plans; Ensuring all tests are conducted prior to final certification.
The commercial-grade item is procured and inspected upon receipt as per the Inspection Test Plan (ITP) to ensure it meets all defined criteria..
Comprehensive testing as per the Acceptance Test Plan (ATP)verifies that the item’s critical characteristics align with safety standards.
A Comprehensive Commercial-grade dedication package which also includes the Final Inspection and Certification of the item(s) are provided to the customer, confirming with reasonable assurance that the dedicated commercial-grade item (CGI) will perform its required safety function(s). The package contains all the information needed for plant engineers to effectively manage the lifecycle of the component.